{"id":14186,"date":"2025-07-17T09:40:29","date_gmt":"2025-07-17T00:40:29","guid":{"rendered":"https:\/\/www.rts-pv.com\/en\/?post_type=blogs&#038;p=14186"},"modified":"2025-07-14T12:24:24","modified_gmt":"2025-07-14T03:24:24","slug":"japans-key-ministries-align-strategies-to-close-the-pv-deployment-gap-and-meet-fy-2030-energy-mix-targets","status":"publish","type":"blogs","link":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/","title":{"rendered":"Japan&#8217;s key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets"},"content":{"rendered":"<div style=\"background: #f6f6f6;padding: 16px 24px;margin-bottom: 1em\">\n<div class=\"row\">\n<div class=\"large-8 small-12\">\n<h6 style=\"margin-bottom: 10px\">Japan Solar Update: No.157 (July 14 ~ 18, 2025)\u00a0<\/h6>\n<\/div>\n<h6 class=\"large-4 small-12\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg\" alt=\"73rd Large-Volume Introduction of Renewable Energy and Next Generation Electricity Network Meeting\" width=\"210\" height=\"151\" class=\"alignnone  wp-image-12546\" \/><\/h6>\n<\/div>\n<\/div>\n<p>Japan&#8217;s key ministries aim to close the gap between actual PV deployment and 2030 targets by promoting solar on public facilities, infrastructure, and farms, with integrated policy discussions set for the next meeting.<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #f5deb3;padding: 10px;border: 2px#3399cc;border-radius: 5px\">\n<p><strong><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\">&lt;Key points&gt;<\/span><\/span><\/span><\/strong><\/p>\n<ul>\n<li>Interviews were conducted with the Ministry of the Environment (MoE), the Ministry of Land, Infrastructure, Transport and Tourism (MLIT), and the Ministry of Agriculture, Forestry and Fisheries (MAFF) regarding the progress in initiatives toward achieving the targets of FY 2030 energy mix<\/li>\n<li>Concerns were raised over the gap between actual results and the targets, and opinions were expressed emphasizing the importance of expanding PV introduction to public facilities, infrastructure such as airports, roads, and railways, as well as agrivoltaics<\/li>\n<li>At the next meeting, initiatives by relevant ministries, including METI, will be integrated, and the overall picture of future renewable energy policy will be discussed<\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<div style=\"background: #f5deb3;padding: 6px;width: 62%;height: 50px;border-radius: 10px;border: solid #ff8c00;float: left\">\n<p style=\"text-align: left\"><span style=\"color: #000000\">Progress in the initiatives to achieve the targets of\u00a02030 energy mix<\/span><\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 38%;height: 50px;border-radius: 10px;border: solid #ffffff;float: left\">Interviews were conducted with relevant ministries<\/div>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center\"><span style=\"text-decoration: underline\"><strong>Follow-up on the policy measures to expand PV deployment<\/strong><\/span><\/p>\n<table style=\"collapse;padding: 6px;margin: 10px;width: 100%\">\n<tbody>\n<tr style=\"height: 40px\">\n<td style=\"width: 240px;background: #ffffcc;border: 1px solid black;text-align: center\"><strong>Policy measures<\/strong><\/td>\n<td style=\"width: 10px;background: #ffffcc;border: 1px solid black;text-align: center\"><strong>Ministries <\/strong><\/td>\n<td style=\"width: 10px;background: #ffffcc;border: 1px solid black;text-align: center\"><strong>Target<\/strong><\/td>\n<td style=\"width: 10px;background: #ffffcc;border: 1px solid black;text-align: center\"><strong>Progress<\/strong><\/td>\n<\/tr>\n<tr style=\"height: 40px\">\n<td style=\"width: 120px;background: #ffffcc;border: 1px solid black\"><strong>PV introduction with the initiative of the public sector<\/strong><\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">MoE<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">6.0 GW<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">0.22 GW*<\/td>\n<\/tr>\n<tr style=\"height: 40px\">\n<td style=\"width: 120px;background: #ffffcc;border: 1px solid black\"><strong> PV introduction in harmony with local communities <\/strong><\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">MoE,MAFF<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">4.1 GW<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">1.1 GW*<\/td>\n<\/tr>\n<tr style=\"height: 40px\">\n<td style=\"width: 120px;background: #ffffcc;border: 1px solid black\"><strong> Promotion of renewable energy introduction in harmony with local communities <\/strong><\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">MoE,MAFF<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">4.1 GW<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">0.3 GW**<\/td>\n<\/tr>\n<tr style=\"height: 40px\">\n<td style=\"width: 120px;background: #ffffcc;border: 1px solid black\"><strong>Establishment of airports as renewable energy hubs <\/strong><\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">MLIT<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">2.3 GW<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">0.2 GW (FY 2020) PV installed capacities in FY 2024 are being aggregated<\/td>\n<\/tr>\n<tr style=\"height: 40px\">\n<td style=\"width: 120px;background: #ffffcc;border: 1px solid black\"><strong>Promotion of self-consumption by private businesses<\/strong><\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">MoE<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">10.0 GW<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">1.7 GW &#8211; 3.2 GW*<\/td>\n<\/tr>\n<tr style=\"height: 40px\">\n<td style=\"width: 120px;background: #ffffcc;border: 1px solid black\"><strong>Strengthening of policy measures for newly built residences <\/strong><\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">MLIT, METI, MoE<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">PV installation ratio on newly built residences: 60.0% (3.5 GW)<\/td>\n<td style=\"width: 10px;border: 1px solid black;text-align: center\">\n<p>31.4% (FY 2022)<\/p>\n<p>36.5% <span style=\"font-family: inherit;font-size: inherit;letter-spacing: 0.05em\">(FY 2023)<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center\"><span style=\"font-size: 10pt\">*: Installed capacity between FY 2020 and FY 2024 ** Installed capacity between FY 2020 and FY 2023<\/span><\/p>\n<p>Committee members raised questions and comments regarding concerns about the gap between the target for the PV introduction with the initiative of the public sector and the actual installed capacity to date, the need to supplement data on the installed capacity of PV systems for self-consumption, and <span style=\"color: #ff0000\">efforts related to agrivoltaics<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Key responses from the ministries<\/strong><\/p>\n<div style=\"background: #ffffff;padding: 4px;width: 100%;height: 215px;border-radius: 1px;border: thin solid  #000000;float: left\">\n<p style=\"text-align: left\"><span style=\"color: #000000\"><strong>MoE<\/strong>: Regarding the<span style=\"color: #ff0000\"> deployment using PPAs<\/span>, efforts are underway to explore approaches such as aggregating multiple facilities Key responses from the ministries <\/span><\/p>\n<p style=\"text-align: left\"><span style=\"color: #000000\"><strong>MLIT<\/strong>: Deployment in various sectors will be considered while observing technological and market trends of <span style=\"color: #ff0000\">perovskite solar cells <\/span><\/span><\/p>\n<p style=\"text-align: left\"><span style=\"color: #000000\"><strong>MAFF<\/strong>: As for <span style=\"color: #ff0000\">local production and consumption of renewable energy<\/span>, there is no intention to limit its local use to agriculture alone. However, initiatives that sell electricity via PPAs to agriculture-related facilities and the food industry, etc. <span style=\"color: #ff0000\">and return the profits to agriculture, are important<\/span><\/span><\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n<div style=\"background: #f5deb3;padding: 6px;width: 32%;height: 40px;border-radius: 10px;border: solid #ff7f50;float: left\">\n<p style=\"text-align: center\"><span style=\"color: #000000\">Chairperson Hirotaka Yamauchi <\/span><\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<div style=\"background: #fffffff;padding: 10px;border: 2px#ff7f50;border-radius: 5px\">\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 4px;width: 100%;height: 185px;border-radius: 1px;border: thin solid #000000;float: left\">\n<p><span style=\"font-size: 12pt\"><span style=\"letter-spacing: 0.05em\">Overall, there are <span style=\"color: #00ffff\">concerns about the gap between the targets and the actual results<\/span>, and thorough discussions on how to address this issue are needed. It comes down to how we can expand <span style=\"color: #ff0000\">PV introduction to public facilities based on the Act on Promotion of Global Warming Countermeasures, infrastructures such as airports, roads, and railways, as well as agrivoltaics. At the next meeting, in addition to the efforts of METI, the overall picture of future renewable energy policy will be discussed by integrating the initiatives of all relevant ministries<\/span><\/span><\/span><\/p>\n<\/div>\n<p style=\"text-align: center\"><span style=\"font-size: 10pt\">Figure 1 Results of interviews on the progress in the initiatives to achieve the targets of FY 2030 energy mix <\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt\">Source: Materials from the 73rd meeting of the Subcommittee for Large-volume Introduction of Renewable Energy and Next Generation Electricity Network (May 27, 2025), compiled by RTS Corporation <\/span><\/p>\n<\/div>\n","protected":false},"featured_media":14361,"template":"","blogs_category":[44],"class_list":["post-14186","blogs","type-blogs","status-publish","has-post-thumbnail","hentry","blogs_category-regulations-government-initiatives"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Japan&#039;s key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets | RTS Corporation<\/title>\n<meta name=\"description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Japan&#039;s key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets | RTS Corporation\" \/>\n<meta property=\"og:description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/\" \/>\n<meta property=\"og:site_name\" content=\"RTS Corporation\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"598\" \/>\n\t<meta property=\"og:image:height\" content=\"397\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/\",\"url\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/\",\"name\":\"Japan's key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets | RTS Corporation\",\"isPartOf\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg\",\"datePublished\":\"2025-07-17T00:40:29+00:00\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#primaryimage\",\"url\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg\",\"contentUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg\",\"width\":598,\"height\":397,\"caption\":\"Japan's PV deployment measures\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HOME\",\"item\":\"https:\/\/www.rts-pv.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PV Blog\",\"item\":\"https:\/\/www.rts-pv.com\/en\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Japan&#8217;s key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#website\",\"url\":\"https:\/\/www.rts-pv.com\/en\/\",\"name\":\"RTS Corporation\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in\",\"publisher\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rts-pv.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#organization\",\"name\":\"RTS Corporation\",\"url\":\"https:\/\/www.rts-pv.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"contentUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"width\":610,\"height\":88,\"caption\":\"RTS Corporation\"},\"image\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/rts-corporation\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Japan's key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets | RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/","og_locale":"en_US","og_type":"article","og_title":"Japan's key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets | RTS Corporation","og_description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","og_url":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/","og_site_name":"RTS Corporation","og_image":[{"width":598,"height":397,"url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/","url":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/","name":"Japan's key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets | RTS Corporation","isPartOf":{"@id":"https:\/\/www.rts-pv.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#primaryimage"},"image":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg","datePublished":"2025-07-17T00:40:29+00:00","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","breadcrumb":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rts-pv.com\/en\/blogs\/14186\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#primaryimage","url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg","contentUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/Japans-PV-deployment-measures.jpg","width":598,"height":397,"caption":"Japan's PV deployment measures"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14186\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HOME","item":"https:\/\/www.rts-pv.com\/en\/"},{"@type":"ListItem","position":2,"name":"PV Blog","item":"https:\/\/www.rts-pv.com\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"Japan&#8217;s key ministries align strategies to close the PV deployment gap and meet FY 2030 energy mix targets"}]},{"@type":"WebSite","@id":"https:\/\/www.rts-pv.com\/en\/#website","url":"https:\/\/www.rts-pv.com\/en\/","name":"RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in","publisher":{"@id":"https:\/\/www.rts-pv.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rts-pv.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.rts-pv.com\/en\/#organization","name":"RTS Corporation","url":"https:\/\/www.rts-pv.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","contentUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","width":610,"height":88,"caption":"RTS Corporation"},"image":{"@id":"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rts-corporation\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/14186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/types\/blogs"}],"version-history":[{"count":30,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/14186\/revisions"}],"predecessor-version":[{"id":14296,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/14186\/revisions\/14296"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/media\/14361"}],"wp:attachment":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/media?parent=14186"}],"wp:term":[{"taxonomy":"blogs_category","embeddable":true,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs_category?post=14186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}