{"id":14606,"date":"2025-10-02T09:00:43","date_gmt":"2025-10-02T00:00:43","guid":{"rendered":"https:\/\/www.rts-pv.com\/en\/?post_type=blogs&#038;p=14606"},"modified":"2025-09-26T08:38:31","modified_gmt":"2025-09-25T23:38:31","slug":"japans-25th-pv-tender-oversubscribed-capacity-and-rising-bid-prices","status":"publish","type":"blogs","link":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/","title":{"rendered":"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices"},"content":{"rendered":"<div style=\"background: #f6f6f6;padding: 16px 24px;margin-bottom: 1em\">\n<div class=\"row\">\n<div class=\"large-8 small-12\">\n<h6 style=\"margin-bottom: 10px\">Japan Solar Update: No.168 (Sept 29 ~ Oct 3, 2025)\u00a0<\/h6>\n<\/div>\n<h6 class=\"large-4 small-12\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg\" alt=\"PV Tender Result\" width=\"227\" height=\"160\" class=\"alignnone  wp-image-14530\" \/><\/h6>\n<\/div>\n<\/div>\n<p>Japan\u2019s 25th PV tender was oversubscribed, with the average winning bid rising to 5.38 yen\/kWh (3.66 cents\/kWh), up 1.32 yen from the previous round. Eight projects totaling 8.2 MW were awarded at zero yen. Looking ahead, the 26th tender will target 163 MW, with strong competition expected as unsuccessful projects reapply.<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #f5deb3;padding: 10px;border: 2px#3399cc;border-radius: 5px\">\n<p><strong><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\">&lt;Key points&gt;<\/span><\/span><\/span><\/strong><\/p>\n<ul>\n<li>In the 25th tender for PV projects, bidding capacity exceeded the target tender capacity, continuing the strong momentum following the 23rd and 24th tenders<\/li>\n<li>Against the ceiling bid price of 8.83 yen\/kWh (6.00 cents\/kWh) (pre-announced) for the 25th tender, the average winning bid price was 5.38 yen\/kWh (3.66 cents\/kWh), an increase of 1.32 yen\/kWh (0.90 cents\/kWh) from the 24th tender. Eight projects totaling 8.2 MW (less than the 24th tender) were awarded at the tender price of zero yen<\/li>\n<li>The target capacity for the 26th tender is 163 MW. Projects that were not awarded in the 25th tender are expected to participate in the 26th tender<\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center\"><span style=\"font-size: 12pt\"><strong>Summary of the results of the PV tenders in FY 2024 and FY 2025 (20th to 25th tenders)<\/strong><\/span><\/p>\n<p style=\"text-align: center\"><span style=\"font-size: 12pt\"><strong>and the target capacity of the 26th tender<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender-300x154.jpg\" alt=\"\" width=\"952\" height=\"489\" class=\"wp-image-14721 aligncenter\" srcset=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender-300x154.jpg 300w, https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg 600w\" sizes=\"auto, (max-width: 952px) 100vw, 952px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/25th-Tender-for-PV-Projects-300x180.jpg\" alt=\"\" width=\"978\" height=\"587\" class=\"wp-image-14722 aligncenter\" srcset=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/25th-Tender-for-PV-Projects-300x180.jpg 300w, https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/25th-Tender-for-PV-Projects.jpg 633w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt\">Figure 1 Summary of the tenders in FY 2024 and FY 2025 and the detailed results of the 25th tender for PV projects <\/span><\/p>\n<p><span style=\"font-size: 10pt\">Source: Results of the 25th tender (second tender of FY 2025) for PV projects announced by the Organization for Cross-regional Coordination of Transmission Operators, JAPAN (OCCTO), etc., compiled by RTS Corporation<\/span><\/p>\n","protected":false},"featured_media":14721,"template":"","blogs_category":[49],"class_list":["post-14606","blogs","type-blogs","status-publish","has-post-thumbnail","hentry","blogs_category-pv-market-size-installation-volume"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices | RTS Corporation<\/title>\n<meta name=\"description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices | RTS Corporation\" \/>\n<meta property=\"og:description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/\" \/>\n<meta property=\"og:site_name\" content=\"RTS Corporation\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"308\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/\",\"url\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/\",\"name\":\"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices | RTS Corporation\",\"isPartOf\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg\",\"datePublished\":\"2025-10-02T00:00:43+00:00\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#primaryimage\",\"url\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg\",\"contentUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg\",\"width\":600,\"height\":308,\"caption\":\"Target Capacity of 26th PV Tender\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HOME\",\"item\":\"https:\/\/www.rts-pv.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PV Blog\",\"item\":\"https:\/\/www.rts-pv.com\/en\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#website\",\"url\":\"https:\/\/www.rts-pv.com\/en\/\",\"name\":\"RTS Corporation\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in\",\"publisher\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rts-pv.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#organization\",\"name\":\"RTS Corporation\",\"url\":\"https:\/\/www.rts-pv.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"contentUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"width\":610,\"height\":88,\"caption\":\"RTS Corporation\"},\"image\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/rts-corporation\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices | RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/","og_locale":"en_US","og_type":"article","og_title":"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices | RTS Corporation","og_description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","og_url":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/","og_site_name":"RTS Corporation","og_image":[{"width":600,"height":308,"url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/","url":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/","name":"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices | RTS Corporation","isPartOf":{"@id":"https:\/\/www.rts-pv.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#primaryimage"},"image":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg","datePublished":"2025-10-02T00:00:43+00:00","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","breadcrumb":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rts-pv.com\/en\/blogs\/14606\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#primaryimage","url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg","contentUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2025\/09\/Target-Capacity-of-26th-PV-Tender.jpg","width":600,"height":308,"caption":"Target Capacity of 26th PV Tender"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/14606\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HOME","item":"https:\/\/www.rts-pv.com\/en\/"},{"@type":"ListItem","position":2,"name":"PV Blog","item":"https:\/\/www.rts-pv.com\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"Japan\u2019s 25th PV Tender: Oversubscribed Capacity and Rising Bid Prices"}]},{"@type":"WebSite","@id":"https:\/\/www.rts-pv.com\/en\/#website","url":"https:\/\/www.rts-pv.com\/en\/","name":"RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in","publisher":{"@id":"https:\/\/www.rts-pv.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rts-pv.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.rts-pv.com\/en\/#organization","name":"RTS Corporation","url":"https:\/\/www.rts-pv.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","contentUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","width":610,"height":88,"caption":"RTS Corporation"},"image":{"@id":"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rts-corporation\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/14606","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/types\/blogs"}],"version-history":[{"count":12,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/14606\/revisions"}],"predecessor-version":[{"id":14751,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/14606\/revisions\/14751"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/media\/14721"}],"wp:attachment":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/media?parent=14606"}],"wp:term":[{"taxonomy":"blogs_category","embeddable":true,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs_category?post=14606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}