{"id":15349,"date":"2026-02-26T09:00:08","date_gmt":"2026-02-26T00:00:08","guid":{"rendered":"https:\/\/www.rts-pv.com\/en\/?post_type=blogs&#038;p=15349"},"modified":"2026-02-20T11:38:39","modified_gmt":"2026-02-20T02:38:39","slug":"meti-finalize-%c2%a51-00-kwh-increase-in-fy2026-fit-balancing-cost","status":"publish","type":"blogs","link":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/","title":{"rendered":"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost"},"content":{"rendered":"<div style=\"background: #f6f6f6;padding: 16px 24px;margin-bottom: 1em\">\n<div class=\"row\">\n<div class=\"large-8 small-12\">\n<h6 style=\"margin-bottom: 10px\">Japan Solar Update: No.189 (Feb 23 ~ 27, 2026)\u00a0<\/h6>\n<\/div>\n<h6 class=\"large-4 small-12\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg\" width=\"241\" height=\"160\" class=\"\" \/><\/h6>\n<\/div>\n<\/div>\n<p>The Ministry of Economy, Trade and Industry (METI) and the Agency for Natural Resources and Energy (ANRE) finalized the policy to increase the FIT balancing cost for fiscal year 2026 by a flat 1.00 yen per kWh. The rationale for the increase was that changes to the priority power supply rules will increase output control of FIT power sources, reducing the burden on the public by approximately 1.12 yen.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt;color: #ff0000\"><\/span><\/p>\n<div style=\"background: #f5deb3;padding: 10px;border: 2px#3399cc;border-radius: 5px\">\n<p><strong><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\">&lt;Key points&gt;<\/span><\/span><\/span><\/strong><\/p>\n<ul>\n<li>For FY 2026, the scope of PV tenders will remain the same as FY 2025, covering ground-mounted PV systems with a capacity of 250 kW or more<\/li>\n<li>The ceiling price will be raised, and the same ceiling price will be applied to all four tender rounds to be conducted during the fiscal year<\/li>\n<li>The tendered capacity of the first round will be set at 91 MW, and from the second round onward, the tendered capacity will be flexibly reviewed based on the bidding results of the previous tender round<\/li>\n<li>The increase in balancing costs for FY 2026 will be 1.00 yen\/kWh (0.65 cents\/kWh)<\/li>\n<li>From FY 2027 onward, the transition from the FIT program to the FIP program will continue to be permitted for ground-mounted PV systems with a capacity of 10 kW or more<\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 16px;width: 25%;height: 80px;border-radius: 10px;border: solid  #800000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">PV Tender for FY 2026<\/span><\/strong><\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 75%;height: 80px;border-radius: 1px;border: solid thin #ffff;float: left\">\n<p style=\"text-align: left\"><span style=\"color: #000000\">From FY 2027 onward, FIT\/FIP support will not be applied to commercial (10 kW or more) ground-mounted PV projects; FY 2026 will be the final fiscal year of tender under the current classification<\/span><\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<table style=\"border-collapse: collapse;width: 1020px;height: 300px\">\n<tbody>\n<tr>\n<td style=\"width: 20%;border: 1px solid black;padding: 8px;background-color: #fafad2;text-align: center\">Cieling Price<\/td>\n<td style=\"width: 80%;border: 1px solid black;padding: 8px;background-color: #ffdab9\">\n<ul>\n<li>As in FY 2025, the ceiling price will be announced in advance<\/li>\n<li><span style=\"color: #ff0000\">With a view to raising the ceiling price*, the same ceiling price will be applied<\/span> to all four tender rounds<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 20%;border: 1px solid black;padding: 8px;background-color: #fafad2;text-align: center\">Scope of tender<\/td>\n<td style=\"width: 80%;border: 1px solid black;padding: 8px\">\n<p>As in FY 2025, the tender will apply to ground-mounted PV systems of 250 kW or more (rooftop PV systems will be exempt from the tender scheme)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 20%;border: 1px solid black;padding: 8px;background-color: #fafad2;text-align: center\">No. of tender rounds<\/td>\n<td style=\"width: 80%;border: 1px solid black;padding: 8px\">\n<p>Four rounds, as in FY 2025<\/p>\n<p>&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 20%;border: 1px solid black;padding: 8px;background-color: #fafad2;text-align: center\">Tendered capacity<\/td>\n<td style=\"width: 80%;border: 1px solid black;padding: 8px\">\n<ul>\n<li>The <span style=\"color: #ff0000\">tendered capacity of the first round will be set at 91 MW<\/span>, which corresponds to the average awarded capacity over the most recent one-year period<\/li>\n<li>From the second round onward, the tendered capacity will be flexibly reviewed based on the bid volume in the previous tender round<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"padding-left: 85px\"><span style=\"font-size: 10pt;color: #000000\"><span style=\"color: #ff0000\">*<\/span>This is premised on the parameters of the FY 2026 feed-in tariff\/ standard price for ground-mounted PV systems of 50 kW or more, which will be set anew<\/span><\/p>\n<p><span style=\"color: #000000;font-size: 10pt\"><span style=\"color: #ff0000\">*<\/span>If approval cannot be acquired by the deadline of approval acquisition, the second-stage deposit will be forfeited in full and will not be refunded<\/span><\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 30%;height: 70px;border-radius: 10px;border: solid thin #000000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\"> Onshore wind power tender for FY 2026<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 70%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">\n<p style=\"text-align: left\"><span style=\"color: #000000\">The tendered capacity in the first round will be 0.7 GW, and an additional round will be conducted if the total bid volume exceeds 1.1 GW and so on<\/span><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 15%;height: 70px;border-radius: 10px;border: solid thin #800000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">Balancing Costs <\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 85%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">\n<ul>\n<li>The increase in balancing costs for FY 2026 will be<span style=\"color: #ff0000\"> 1.00 yen\/kWh (0.65 cents\/kWh)<\/span><\/li>\n<li>Any increases from FY 2027 onward will be calculated by the Procurement Price Calculation Committee in the next fiscal year<\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 40%;height: 70px;border-radius: 10px;border: solid thin #000000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">Eligible facilities for which only the FIP program is applied for new approvals <\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 60%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">\n<p>FY 2026 and FY 2027: PV projects with a capacity of 50 kW or more<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 30%;height: 70px;border-radius: 10px;border: solid thin #800000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">Treatment of FIP transition <\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 70%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">\n<p><span style=\"color: #ff0000\">From FY 2027 onward, the transition to the FIP program will continue to be permitted<\/span> for ground-mounted PV systems with a capacity of 10 kW or more<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 40%;height: 70px;border-radius: 10px;border: solid thin #000000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">Treatment of projects applying for approval of change <\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 60%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">Due to rising costs, future feed-in tariff rates and related prices may increase<\/div>\n<p>&nbsp;<\/p>\n<p>If the feed-in tariff or related prices are revised and <span style=\"color: #ff0000\">the latest rates are higher, the rate applicable before submitting the application for approval of change will be maintained<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 40%;height: 70px;border-radius: 10px;border: solid thin #000000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">Requirements for approving power sources as locally-used power sources <\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 60%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">\n<p>The requirements for approving power sources as locally-used power sources for PV systems from FY 2027 onward will be examined in FY 2026 starting in April 2026 or later<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #ffffff;padding: 6px;width: 30%;height: 70px;border-radius: 10px;border: solid thin #000000;float: left\">\n<p style=\"text-align: center\"><strong><span style=\"color: #000000\">Standard amount of reserve funds for dismantling, etc. <\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 70%;height: 70px;border-radius: 1px;border: solid thin #ffffff;float: left\">\n<p>Rooftop PV systems of 10 kW or more: set at 1.12 yen\/kWh (0.72 cents\/kWh) for FY 2027, etc.<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt\">Figure 1 PV tender, balancing costs, and related matters for FY 2026<\/span><\/p>\n<p><span style=\"font-size: 10pt\">Source: Materials of the 113th meeting of the Procurement Price Calculation Committee (January 20, 2026), compiled by RTS Corporation<\/span><\/p>\n","protected":false},"featured_media":15353,"template":"","blogs_category":[44],"class_list":["post-15349","blogs","type-blogs","status-publish","has-post-thumbnail","hentry","blogs_category-regulations-government-initiatives"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost | RTS Corporation<\/title>\n<meta name=\"description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost | RTS Corporation\" \/>\n<meta property=\"og:description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/\" \/>\n<meta property=\"og:site_name\" content=\"RTS Corporation\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/\",\"url\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/\",\"name\":\"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost | RTS Corporation\",\"isPartOf\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg\",\"datePublished\":\"2026-02-26T00:00:08+00:00\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#primaryimage\",\"url\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg\",\"contentUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"2026 PV Tender\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HOME\",\"item\":\"https:\/\/www.rts-pv.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PV Blog\",\"item\":\"https:\/\/www.rts-pv.com\/en\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#website\",\"url\":\"https:\/\/www.rts-pv.com\/en\/\",\"name\":\"RTS Corporation\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in\",\"publisher\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rts-pv.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#organization\",\"name\":\"RTS Corporation\",\"url\":\"https:\/\/www.rts-pv.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"contentUrl\":\"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"width\":610,\"height\":88,\"caption\":\"RTS Corporation\"},\"image\":{\"@id\":\"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/rts-corporation\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost | RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/","og_locale":"en_US","og_type":"article","og_title":"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost | RTS Corporation","og_description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","og_url":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/","og_site_name":"RTS Corporation","og_image":[{"width":1536,"height":1024,"url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/","url":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/","name":"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost | RTS Corporation","isPartOf":{"@id":"https:\/\/www.rts-pv.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#primaryimage"},"image":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg","datePublished":"2026-02-26T00:00:08+00:00","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","breadcrumb":{"@id":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rts-pv.com\/en\/blogs\/15349\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#primaryimage","url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg","contentUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2026\/02\/2026-PV-Tender.jpg","width":1536,"height":1024,"caption":"2026 PV Tender"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rts-pv.com\/en\/blogs\/15349\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HOME","item":"https:\/\/www.rts-pv.com\/en\/"},{"@type":"ListItem","position":2,"name":"PV Blog","item":"https:\/\/www.rts-pv.com\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"METI Finalize \u00a51.00\/kWh Increase in FY2026 FIT Balancing Cost"}]},{"@type":"WebSite","@id":"https:\/\/www.rts-pv.com\/en\/#website","url":"https:\/\/www.rts-pv.com\/en\/","name":"RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in","publisher":{"@id":"https:\/\/www.rts-pv.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rts-pv.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.rts-pv.com\/en\/#organization","name":"RTS Corporation","url":"https:\/\/www.rts-pv.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","contentUrl":"https:\/\/www.rts-pv.com\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","width":610,"height":88,"caption":"RTS Corporation"},"image":{"@id":"https:\/\/www.rts-pv.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rts-corporation\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/15349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/types\/blogs"}],"version-history":[{"count":34,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/15349\/revisions"}],"predecessor-version":[{"id":15424,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs\/15349\/revisions\/15424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/media\/15353"}],"wp:attachment":[{"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/media?parent=15349"}],"wp:term":[{"taxonomy":"blogs_category","embeddable":true,"href":"https:\/\/www.rts-pv.com\/en\/wp-json\/wp\/v2\/blogs_category?post=15349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}