Municipal Facilities’ PV Introduction Target

2024.05.02
Regulations/Initiatives
Japan Solar Update: No.94 (Apr 29 ~ May 3, 2023)         
PV Installation Target

The government has set for the first time a target for the introduction of solar power generation for various types of municipal facilities.

The total target for facility-wide introduction in FY 2030 is 4.82 GW, with targets set for different types of facilities such as elementary and junior high schools at 1,331 MW, public housing at 440 MW, social and sports facilities at 327 MW, and administrative facilities at 188 MW.

 

<Key points>

  • The government set a PV installed capacity target of 4.82GW in the facilities of local governments in FY 2030
  • By facility type, elementary and junior high school facilities have a maximum target capacity of 1.33 GW, followed by waste treatment facilities with 0.44 GW
  • Aiming for 6.0 GW of PV installations in the public sector by FY 2030, with the installation target (0.06 GW) at government-owned facilities and other additional initiatives
  • The roofs and walls of each government agency’s facilities will be investigated and targets for perovskite solar cells (PSCs) will be considered

 

PV installed capacity targets of local governments’ facilities in FY 2030 by facility type

4.82GW

 

 

It is assumed that local governments themselves will set targets in accordance with the national government’s implementation plan with reference to the introduction targets and work on them on their own in parallel, relevant ministries and agencies will provide support, advice, and information with each other

 

PV Installation Target

Figure 1 Setting of PV installed capacity targets for local governments’ facilities by facility type

 

+

PV installed capacity target (0.06GW) for government-owned facilities and other additional initiatives

 

 

 

In total it is aimed to introduce 6.0 GW in the public sector by FY 2030

 

A survey on roofs and walls suitable for the installation of PSCs at the facilities owned by ministries and agencies is planned to be conducted in FY 2024 Based on the survey results, targets for PCS will be considered.

 

 

Source: Materials of the second meeting of the Liaison meeting of relevant ministries and agencies on decarbonization of the public sector (March 25, 2024), compiled by RTS Corporation